On another note, the rest of the house is moving along. Garage doors are installed, the cedar posts are being wrapped in stone, cabinets are being built (and hopefully delivered soon!), the decking for the tub in the master bathroom has been partially built, and the drywall is in and just about ready for tile, and the pantry shelves are almost complete. Once all of these things are installed and complete, it's time for paint. Then, the floors will start going in!!!! I'm also excited because I helped to design how our fireplace hearth and shelving would be installed.
I have to admit, I am more than ready to be in this house. I love seeing the process, but I'm ready for us to start the new process of being a family in our forever house!!!
My shoe shelves :)
Master closet
Master closest
Master closet
1/2 of the pantry
Front Porch
Entry
Cedar posts inside
Tub decking and shower









No comments:
Post a Comment